Temporary Grounding for De-Energized Maintenance (Hubbell)

Summary
This 27-minute video shows how to ground an overhead distribution line. Three configurations are demonstrated: a tangent structure, a vertical running corner, and a vertical dead-end. In each case, the neutral and each phase are connected to the pole, and then to a ground rod.(Courtesy Hubbell)